Direct OE replacement fluid metering head assembly for the Neptune DOS Fluid Metering System. The easy to install head replaces the tubing, roller, and plastic housing head cap.
- Installs in minutes
- Replaces wearable tubing
What’s Included?
1x Head Housing
1x Roller Assembly
1x Tubing Assembly
How to Replace
Step 1: Hold down the sides of the Dos Head and the clips will release. Remove the pump head and set it aside.
Step 2: Pick up your new pump head and slip it right down into the old heads position and the clips should click into place. Test the Pumps rotation with the manual priming buttons.
Reviews
There are no reviews yet.